Abstract
This paper presents case histories on two commercial projects that incorporated industrial surface preparation, application and quality control standards and procedures into the work plans to achieve successful results. Highlights of SSPC audits for QP-8 and QP-9 recertification on the projects will also be discussed.
© 2016 Association for Materials Protection and Performance (AMPP). All rights reserved. This work is protected by both domestic and international copyright laws. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2016
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.