Abstract
Most flooring materials require a dry sub-straight before they can be applied and many of the flooring manufacturers have added maximum floor moisture content for their warranties to maintained. Contractors responsible for getting a building turned over to the owner are often finding themselves making a choice between shot basting and sealing the floors or setting up a temporary climate control system.
Subject
Buildings,
Vapor pressure,
Test methods,
Water,
Materials,
Moisture,
Climate,
Dehumidification,
Flooring,
Slabs,
Drying,
Relative humidity,
Concrete
© 2012 Association for Materials Protection and Performance (AMPP). All rights reserved. This work is protected by both domestic and international copyright laws. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2012
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.