Abstract
This discussion will review case studies from several bridge access projects where suspended scaffolding was used to provide safe, economical access for crews performing inspection, structural repair, demolition, blasting and coating work. Special attention will be paid to advanced project planning, worker safety requirements, unique platform configurations and productivity improving tips.
© 2012 Association for Materials Protection and Performance (AMPP). All rights reserved. This work is protected by both domestic and international copyright laws. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2012
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.