The construction of a major project such as a bridge can often provide significant challenges to say the least. These challenges are not always within the physical building or logistics of the bridge but often can be material related. One such challenge can be the curing of the materials on the project. To that end, Cianbro/Middlesex, a large industrial contractor, knew that they would need temporary climate control to meet the tight specifications for concrete curing during a construction project for the new Pearl Harbor Memorial Bridge in New Haven, Conn.

You do not currently have access to this content.