The construction of a major project such as a bridge can often provide significant challenges to say the least. These challenges are not always within the physical building or logistics of the bridge but often can be material related. One such challenge can be the curing of the materials on the project. To that end, Cianbro/Middlesex, a large industrial contractor, knew that they would need temporary climate control to meet the tight specifications for concrete curing during a construction project for the new Pearl Harbor Memorial Bridge in New Haven, Conn.
© 2011 Association for Materials Protection and Performance (AMPP). All rights reserved. This work is protected by both domestic and international copyright laws. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2011
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.