Abstract
This paper describes concrete rehabilitation of the primary treatment process at the Fairfield-Suisun Sewer District Treatment Facility. The paper encompasses V&A’s initial concrete condition evaluation, coating specifications, and the warranty coating inspection. Notable items of discussion include coating selection, construction window, flow diversion schemes, and full-time coating inspection.
© 2007 Association for Materials Protection and Performance (AMPP). All rights reserved. This work is protected by both domestic and international copyright laws. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2007
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.