Abstract
Coatings maintenance projects are typically scheduled and selected based on ASTM rust grade, service environment - corrosion rate, coating condition and project visibility or aesthetics. There is something missing. That something is a risk based assessment. This paper will demonstrate how to make a risk grid and accommodate this into condition assessment criteria for prioritizing and scheduling painting projects.
© 2006 Association for Materials Protection and Performance (AMPP). All rights reserved. This work is protected by both domestic and international copyright laws. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2006
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.