Abstract
During the testing of circular grit chambers in a wastewater treatment plant under construction, serious leaking problems were discovered prior to project completion. After meetings with the Owner, Design and Construction engineering firms, painting contractor and coatings manufacturer, the decision was made to apply 80 mils of pure polyurea to various concrete surfaces. This presentation, through the use of photo images taken during remediation, describes the nature of the problem and how it was solved.
© 2006 Association for Materials Protection and Performance (AMPP). All rights reserved. This work is protected by both domestic and international copyright laws. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2006
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.