The County of Madison, MS. experienced severe degradation of a major pump station in their system that was less than 10 years old. They contracted with Waggoner Engineering of Jackson, MS. to design a rehabilitation system as well as increase the structural integrity with the addition of some support walls. The project created scheduling issues due to the addition of new concrete structures to the pump station. The use of innovative coatings technologies that offered the ability to apply corrosion resistant linings over green concrete structures, dramatically enhanced the project schedule and reduced overall costs.
Subject
Hydrogen sulfide,
Water,
Moisture,
Walls,
Solids,
Rehabilitation,
Cement,
Construction,
Sewage systems,
Epoxies,
Urethane,
Concrete,
Waste water
© 2019 Association for Materials Protection and Performance (AMPP). All rights reserved. This work is protected by both domestic and international copyright laws. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2019
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.