Simultaneous recordings of telluric current fluctuations in pipe-to-soil potentials were made at nineteen locations along the gas pipelines in southern Sweden. During the recordings, bonds across insulating joints were switched in and out to vary the electrical length of pipeline sections, and examine how pipeline length influences telluric current effects. The largest potential variations occurred at the ends of electrically-connected sections with a null point in the middle of the section. Changing the joint configuration significantly altered the position where the largest potentials occurred. Model calculations accurately reproduced the potential profiles obtained from the observations.
© 2001 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2001
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.