Abstract
This paper will discuss a practical example of how large FRP equipment can be effectively repaired during a short turnaround. A large FRP Scrubber Tower, vital to operation of the plant, had developed leaks which were becoming an environmental concern. The paper will cover the initial inspections and evaluation, outline of repair procedures, and documentation of actual repairs.
© 2000 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2000
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.