Abstract
The prediction of the CO2 corrosion rate is quite important in the design of the corrosion control methods for well tubular, pipelines and other components in the Oil and Gas industry. The paper deals with the discussion of case histories relevant to the CO2 corrosion failure of carbon steel components in oil production. The morphology (uniform or localised attacks), corrosion rate, and operating conditions are examined and discussed comparing them to the output of the prediction models, available in the literature, for the CO2 corrosion prediction.
© 1998 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
1998
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.