Abstract
In the design and installation of cathodic protection for underground storage tanks, one now and again encounters unusual situations. Paper describes handling situations where field conditions are not as expected, coordinating construction with other contractor operations, design considerations for unusual situations, preparing field changes when tank or piping systems are not as planned (metal instead of FRP, eg.). These situations may be encountered with both new installations and with upgrading old ones.
© 1997 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
1997
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.