Abstract
Early in the operation of a zero discharge water treatment system, which reclaims paper mill effluent to provide cooling tower makeup for a power plant, effects from the organic loading in the influent prevented operation of the Reverse Osmosis (RO) Units and hampered operation of Clarifier/Softeners, Brine Concentrators and a Crystallizer. Solutions implemented to remediate the problems included front-end treatment of the influent to improve oxidation and coagulation, down-stream nano-filtration of the wastewater to facilitate RO operation, and back-end charge neutralization and variation of the total dissolved solids (TDS) to organics ratio to improve crystallizer operation.
© 1996 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
1996
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.