A contract to provide simulation trainers contained specific corrosion control design and material requirements. The contractor requested assistance to determine how the requirements could be incorporated into the design. The contract corrosion control requirements are listed along with an interpretation of how to incorporate them into the design.

You do not currently have access to this content.