Abstract
This paper presents actual case histories of sacrificial anode cathodic protection installations on a variety of power system pole and tower foundation types. The case histories show strong points and weaknesses of various grounding system and cathodic protection system designs and present some operating system histories. Grounding system design, foundation design and cathodic protection system design recommendations are made for future power line construction projects.
© 1988 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
1988
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.