The results of a planned interval test of 90 days duration in a model flue gas desulfurization system are discussed. Tests were conducted in a high chloride, limestone slurry based environment containing fluoride and flyash. Corrosion in absorber and outlet duct zones is outlined in terms of relative tendencies of localized corrosion propagation for six alloys.

You do not currently have access to this content.