Abstract
The factors to be considered in design and conduct of a corrosion monitoring program using test racks in chemical process environments are discussed. Several test methods are referenced and cautions to be aware of and followed are presented. The importance of appropriate interpretation and documentation of test results is also emphasized.
© 1986 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
1986
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.