Abstract
Miami Fort Unit 7 began commercial operation in May 1975. Evidence of solid particle erosion first appeared in October 1977. Since that time solid particle erosion damage has necessitated extensive and costly repairs.
The purpose of this paper is to allow the others to benefit from the authors' experience in justifying, organizing, designing, and conducting a superheater-reheater acid cleaning project.
Subject
Costs,
Water,
Piping,
Solid particles,
Tubes,
Chemical cleaning,
Condensates,
Lead,
Reheaters,
Erosion,
Boilers,
Steam,
Cleaning
© 1985 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
1985
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.