Abstract
This paper discusses the four cornerstones of a good maintenance painting program--specifications, contractors, coating materials and inspection. The contribution of each toward reducing cost is discussed. The means for managing a paint program at the lowest cost/sq. ft./year are presented.
© 1982 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).