This paper presents the outcome of search during the past year, for innovations in instrumentation and hook-up techniques employed in coaxial lead cable corrosion testing. The search was motivated by a need to make the testing job more productive, that is, to increase the engineering validity of test data and at the same time to reduce the skill level required to accomplish a satisfactory job of testing.
© 1970 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
1970
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.