Abstract
This paper presents a case study of a pipeline release attributed to AC induced corrosion. Shortcomings were identified in the operator’s integrity and corrosion programs which would normally prevent such a release. Based on the findings, the operator completed additional excavations, conducted an AC interference study, and developed an enterprise wide program focused on identifying, monitoring, and mitigating AC interference. The paper examines the results of each mitigative action and process adjustment taken by the operator.
© 2021 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2021
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.