Abstract
Under an Integrity Management Program (IMP) for natural gas transmission lines, the ECDA concept was analyzed and the process was validated from 2002 to 2004. A Plan was developed and implemented in 2004 on one 17 km pipeline and segments of two other pipelines. This paper covers the Request for Proposal (RFP) methodology, the selection of a service provider, the execution plan and the results obtained.
© 2005 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).