Abu Attifel onshore oil field (Libya) was discovered in 1968 and put in production in November 1972. The total average production is nowadays about 140,000 BOPD (22,260 m3/d) with 46 producing wells.
All the production wells were originally completed with carbon steel tubing, although the produced fluids contain CO2 - 4 % in the gas phase. After several years of production with minor downhole corrosion problems, several corrosion failures started to occur in the nineties at extremely high corrosion rate. In some cases corrosion attacks occurred although the water cut was negligible (lower than 1%).
A detailed corrosion study was initiated to investigate the problem in order to identify the most critical production wells and the priority of intervention for well; this paper reports the corrosion assessment results and the actions undertaken to control the corrosion. A review on occurred corrosion events is also reported.