Abstract
With the recent addition of scrubbing systems to power plants, a variety of costly materials problems have evolved. To maintain or increase system reliability and lower component replacement cost, a formal materials research program should be adopted by utilities. PEPCO has actively pursued a materials program through five phases: literature search and information exchanges, laboratory testing, in-situ testing, environment monitoring, and equipment inspections.
© 1983 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
1983
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.