Abstract
In recent years, Changqing Oilfield has continuously enlarged the scale of exploration and development, and its oil and gas equivalent output has exceeded 6,500 × 104t/a. However, the oilfield has been developed by multiple reservoir system stacking, and it has gradually entered the stage of medium-high water cut, and scaling has become more and more prominent impact of production system. In accordance with compose the prevention and control strategy, chemical and physical scaling technology research and on-site tests have been combined to extend the scaling cycle and slow down the scaling rate, and achieve good results.
© 2024 Association for Materials Protection and Performance (AMPP). All rights reserved. This work is protected by both domestic and international copyright laws. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2024
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.