Abstract
An AC interference study and mitigation design was performed for a pipe replacement project. The project was broken up into multiple phases due to a construction schedule that spans multiple years. This paper is a case study examining the process of performing a piece-wise vs a holistic mitigation design for the pipeline. Designs are based on field data and software modeling. Designs for each approach are compared and their differences and benefits are explored.
© 2023 Association for Materials Protection and Performance (AMPP). All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted, in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise) without the prior written permission of AMPP. Positions and opinions advanced in this work are those of the author(s) and not necessarily those of AMPP. Responsibility for the content of the work lies solely with the author(s).
2023
Association for Materials Protection and Performance (AMPP)
You do not currently have access to this content.